Home Page
PROJECT OVERVIEW

Visuals - Photo Gallery

 

CONSTRUCTION PHOTOS - IH 35W (NORTH OF IH 820) - MARCH 2014

 

 

March 2014: Bridge cap construction at Western Center Blvd.

March 2014: Preparing for concrete deck for new northbound direct connector to US 287

March 2014: Constructing storm drain system on southbound frontage road south of Western Center Blvd.

 

January 2014: IH 35W north between Western Center Blvd. and IH 820

January 2014: IH 35W north at Western Center Blvd

January 2014: IH 35W north at Basswood Blvd

 

January 2014: IH 35W south at US 81/287 interchange

July 2013: IH 35W north of IH 820

July 2013: IH 35W looking north over Western Center Blvd.

 

July 2013: IH 35W looking north over Basswood Blvd.

July 2013: IH 35W looking south over the US 287 interchange

June 2013: Bridge abutment work in median at Western Center Blvd.

 

June 2013: Bridge columns at Western Center Blvd.

June 2013: Rebar for bridge structures

June 2013: Bridge substructure work at Big Fossil Creek

 

June 2013: Bridge substructure work for U-turns at Basswood Blvd.

June 2013: Utility contractor boring City of Fort Worth water line at Western Center Blvd.

June 2013: Grading for new northbound ramp to US 287 north of Basswood Blvd.

 
   

June 2013: Scraper performing road grading at US 287 interchange

   
 
 
HOME  |  CONTACT US  |  For more information, call 1-888-NTE-2015 / 1-888-683-2015